login:
English
Case Studies
 
Environmental Policy
Water & Flood Management
Waste & Pollution Management
Environmental Impact Assessment
Renewable Energy
Ecology
Environmental Information Management
Environmental Permitting
Research and Development
   
   
 
Home Page / Case Studies / Waste & Pollution Management / Strategic Plan, Strategic Environmental Assessment, EIAs, Fesibility Study and Preparation of Construction Tender Documents for the development of Green Points (Recycling Parks - Civic Amenity Sites) in Cyprus and supervision of construction works. Minist
Print this page
 
 
Strategic Plan, Strategic Environmental Assessment, EIAs, Feasibility Study and Preparation of Construction Tender Documents for the development of Green Points (Recycling Parks - Civic Amenity Sites) in Cyprus and supervision of construction works
Client:  Solid Waste Division
Ministry of Interior
Cyprus
Region: Cyprus
Type: Waste & Pollution Management, Environmental Impact Assessment
Duration: 06/2009 - 2014
Other Partners: EPEM S.A. (Greece)


The overall aim of the project is the development of a national network for the collection of recyclable materials and special wastes (Green Points). The Green Points Network will substantially improve the quality of life of local communities, which is now negatively affected by the uncontrolled waste disposal sites. At the same time the project aims in the implementation of national and European legislation for the Integrated Management of Solid Waste and especially the non-hazardous household waste.

The tasks that were successfully completed and the services that were provided were:

Data Collection and evaluation, topographic surveying and urban assessment of the proposed sites
Strategic Plan for the development of the Green Points national network, which included:
    • assessment of the current conditions,
    • feasibility study,
    • design of the network and proposal of suitable sites,
    • institutional management of the network,
    • design of monitoring plan, and
    • proposal of awareness and consultation campaigns with the public and stakeholders.
Strategic Environmental Assessment (SEA) for the overall Plan
. Environmental Impact Assessments (EIA) for each proposed Green Point Site
. Implementation Studies and Development and Construction Plans for each proposed Green Point Site
. Preparation of Tender Documents for the construction of Green Points Sites
.

Supervision of construction works

What does your facility need?
Environmental Impact Assessment?
Air Emissions permit?
Waste/ Wastewater
Disposal permit?
Waste Management permit?
Environmental Management System?
Waste Monitoring?
Other legal environmental compliance?

Contact us to find out more about our Waste & Pollution Management consultancy services, customized to your specific industrial activity and needs.

 
 
 
 
Copyright © I.A.CO Ltd 2012
Designed and Developed
by NETinfo plc
Site Map | Conditions of Use

Contact Us

Tel: (+) 357 – 22429444
Fax: (+)357 – 22519904
E-mail: info@iaco.com.cy