Client: |
Water Development Department Ministry of Agriculture, Natural Resources and Environment Cyprus subcontracted by Karavokyris & Associates (Greece) - Edafos Consulting Engineers (Greece) |
Region: |
Cyprus |
Type: |
Water & Flood Management |
Duration: |
2006 - 2008 |
Other Partners: |
Karavokyris & Associates (Greece) - Edafos Consulting Engineers (Greece) |
The main objectives of the project were:
 |
Design of an earth dam of 53m height and capacity of 4 to 4.5 Mm3 |
 |
A diversion weir |
 |
A diversion conveyor |
 |
Balancing reservoirs |
 |
Pumping Stations |
 |
Main irrigation pipes |
 |
Preparation of tender documents and supervision of construction of the dam and associated works. |
The tasks that were successfully completed by I.A.CO (as per the memorandum of cooperation which subcontracted I.A.CO for 9% of the objectives of the study, including local management) were:
 |
Meteorological and hydrological data and hydrologic input to the study. |
 |
Electromechanical study for the Pumping Stations: Plans and equipment specifications (as per the Solea Dam study), the lighting of the crest of the dam, and the aeration and lighting of the diversion culvert, and |
 |
Health and Safety Plan for the construction of the dam |
|