I.A.CO Ltd
  • Home
  • Profile
    • History
    • Our Team
    • Our Associates
    • Our Clients
    • Equipment – Software
    • Corporate Responsibility
  • Services
    • Environmental Policy
    • Water & Flood Management
    • Waste & Pollution Management
    • Environmental Impact Assessment
    • Renewable Energy
    • Ecology
    • Environmental Information Management
    • Environmental Permitting
    • Research and Development
  • Case Studies
    • Environmental Policy
    • Water & Flood Management
    • Waste & Pollution Management
    • Environmental Impact Assessment
    • Renewable Energy
    • Ecology
    • Environmental Information Management
    • Environmental Permitting
    • Research and Development
  • News
  • Careers
  • Contact
  • Search
  • Menu Menu
Environmental Impact Assessment

Environmental Impact Assessment of a Waste to Energy Plant of 13MW capacity at Koshi, Larnaca. HELECTOR Cyprus.

in Environmental Impact Assessment, Renewable Energy

Environmental Impact Assessment of a Waste to Energy Plant of 13MWe capacity at Koshi, Larnaca
The project refers to the Environmental Impact Assessment of a Waste to Energy Plant of 13MW through the exploitation of secondary fuels.

Client: HELECTOR Cyprus subcontracted by ENVECO S.A. (Greece)

Region: Cyprus

Type: Environmental Impact Assessment, Renewable Energy, Waste & Pollution Management

Duration: 02/2012 – 04/2012

Other Partners: ENVECO S.A. (Greece)

The EIA study evaluated the development of an Electricity Production Unit through the exploitation of secondary fuels (RDF/ SRF/ organic fraction 0-130 mm) located within the existing installation of Integrated Management of Solid Household Wastes in Koshi, Larnaca. The proposed Waste to Energy Plant will be fully integrated into the existing installations of solid waste management and energy fuel production, since it will operate as a receptor of secondary fuels produced by the processing of municipal solid wastes in the region. At the same time, the power station will generate electricity that will be available for the National Energy Network.

The tasks that were successfully completed and the services that were provided were:

  • Analysis of the current condition of the natural environment of the area (topography, geology, hydrology/hydrogeology, seismicity, soils, meteorology, flora and fauna)
  • Analysis of the socioeconomic conditions of the area (population, economic activities, town planning, land use)
  • Proposal and environmental evaluation of different alternative solutions to the project
  • Evaluation and assessment of the potential environmental impacts that can arise during the project’s construction and operation
  • Formation and proposal of suitable mitigation measures to address the potential environmental impacts
  • Elaboration of monitoring plan to be implemented during the construction and operation of the project
Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on WhatsApp
  • Share on Pinterest
  • Share on LinkedIn
  • Share on Tumblr
  • Share on Vk
  • Share on Reddit
  • Share by Mail
http://www.iaco.com.cy/wp-content/uploads/logo_white.png 0 0 netinfo http://www.iaco.com.cy/wp-content/uploads/logo_white.png netinfo2012-01-15 10:18:142020-01-15 11:27:28Environmental Impact Assessment of a Waste to Energy Plant of 13MW capacity at Koshi, Larnaca. HELECTOR Cyprus.

Case Studies

  • Environmental Policy
  • Water & Flood Management
  • Waste & Pollution Management
  • Environmental Impact Assessment
  • Renewable Energy
  • Ecology
  • Environmental Information Management
  • Environmental Permitting
  • Research and Development

“Addressing needs in an engineering sound and environmentally sustainable manner.”

Links

Home | Profile | Services |
Case Studies | News | Careers | Contact

Contact Us

  • Address: 3 Stavrou Ave. Office 202, Strovolos 2035,
    P.O.Box 28401, Nicosia 2094, Cyprus

  • Telephone: +357 22429444
    Fax:
    +357 22519904

  • Email: info@iaco.com.cy

  • Website: www.iaco.com.cy

Follow

Share

News

  • I.A.CO participates in the elaboration of a comprehensive feasibility study of a combined marine development in Kissonerga community in Paphos, on behalf of the Deputy Ministry of Tourism.09/2021 - 14:02
  • IACO was at the European Researchers’ Night11/2020 - 12:35
  • I.A.CO has signed a Contract with the Presidency for the elaboration of a Strategic Environmental Impact Assessment Study for the National Development Strategy of the Mountainous Communities of Troodos10/2020 - 09:45
Copyright 2016 © IACO, All Rights Reserved. / Powered by NETinfo Plc
  • Sitemap
  • Conditions of Use
Analysis of Scenarios of Water Demand Management – Assessment of Impacts at...Environmental Impact Assessment for a number of Photovoltaic Parks in Cyprus...
Scroll to top