I.A.CO Ltd
  • Home
  • Profile
    • History
    • Our Team
    • Our Associates
    • Our Clients
    • Equipment – Software
    • Corporate Responsibility
  • Services
    • Environmental Policy
    • Water & Flood Management
    • Waste & Pollution Management
    • Environmental Impact Assessment
    • Renewable Energy
    • Ecology
    • Environmental Information Management
    • Environmental Permitting
    • Research and Development
  • Case Studies
    • Environmental Policy
    • Water & Flood Management
    • Waste & Pollution Management
    • Environmental Impact Assessment
    • Renewable Energy
    • Ecology
    • Environmental Information Management
    • Environmental Permitting
    • Research and Development
  • News
  • Careers
  • Contact
  • Search
  • Menu Menu
Water & Flood Management

Final Study, Design, Preparation of Tender Documents and Supervision of Construction of Solea Dam, Cyprus. Ministry of Agriculture, Natural Resources and Environment, Cyprus.

in Water & Flood Management

Final Study and Design, Preparation of Tender Documents and Supervision of Construction of Solea Dam, Cyprus

The aim of the Solea dam is to confront the irrigation problems in the Solea Valley. The irrigation needs at present are met by diversions from the Karyotis river which do not fully cover them. The sizable amounts of winter flows are exploited by diversion and storage in the off- channel dam of 4 Mm3 capacity. An irrigation distribution network will meet the irrigation demand of 3.4Mm3 per year.

Client: Water Development Department Ministry of Agriculture, Natural Resources and Environment Cyprus subcontracted by Karavokyris & Associates (Greece) – Edafos Consulting Engineers (Greece)

Region: Cyprus

Type: Water & Flood Management

Duration: 2006 – 2008

Other Partners: Karavokyris & Associates (Greece) – Edafos Consulting Engineers (Greece)

The main objectives of the project were:

  • Design of an earth dam of 53m height and capacity of 4 to 4.5 Mm3
  • A diversion weir
  • A diversion conveyor
  • Balancing reservoirs
  • Pumping Stations
  • Main irrigation pipes
  • Preparation of tender documents and supervision of construction of the dam and associated works.

The tasks that were successfully completed by I.A.CO (as per the memorandum of cooperation which subcontracted I.A.CO for 9% of the objectives of the study, including local management) were:

  • Meteorological and hydrological data and hydrologic input to the study.
  • Electromechanical study for the Pumping Stations: Plans and equipment specifications (as per the Solea Dam study), the lighting of the crest of the dam, and the aeration and lighting of the diversion culvert, and
  • Health and Safety Plan for the construction of the dam
Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on WhatsApp
  • Share on Pinterest
  • Share on LinkedIn
  • Share on Tumblr
  • Share on Vk
  • Share on Reddit
  • Share by Mail
http://www.iaco.com.cy/wp-content/uploads/logo_white.png 0 0 netinfo http://www.iaco.com.cy/wp-content/uploads/logo_white.png netinfo2006-01-15 10:10:412020-01-15 10:12:21Final Study, Design, Preparation of Tender Documents and Supervision of Construction of Solea Dam, Cyprus. Ministry of Agriculture, Natural Resources and Environment, Cyprus.

Case Studies

  • Environmental Policy
  • Water & Flood Management
  • Waste & Pollution Management
  • Environmental Impact Assessment
  • Renewable Energy
  • Ecology
  • Environmental Information Management
  • Environmental Permitting
  • Research and Development

“Addressing needs in an engineering sound and environmentally sustainable manner.”

Links

Home | Profile | Services |
Case Studies | News | Careers | Contact

Contact Us

  • Address: 3 Stavrou Ave. Office 202, Strovolos 2035,
    P.O.Box 28401, Nicosia 2094, Cyprus

  • Telephone: +357 22429444
    Fax:
    +357 22519904

  • Email: info@iaco.com.cy

  • Website: www.iaco.com.cy

Follow

Share

News

  • I.A.CO participates in the elaboration of a comprehensive feasibility study of a combined marine development in Kissonerga community in Paphos, on behalf of the Deputy Ministry of Tourism.09/2021 - 14:02
  • IACO was at the European Researchers’ Night11/2020 - 12:35
  • I.A.CO has signed a Contract with the Presidency for the elaboration of a Strategic Environmental Impact Assessment Study for the National Development Strategy of the Mountainous Communities of Troodos10/2020 - 09:45
Copyright 2016 © IACO, All Rights Reserved. / Powered by NETinfo Plc
  • Sitemap
  • Conditions of Use
Hydrologic and Hydraulic Study for the Pedhieos River within Nicosia Municipality...Development of Integrated National Water Monitoring Programme and Development...
Scroll to top